Grupo Gaia 24/7 Emergencies
Area 1 of 6

Project development

From the land to the approved design: topographic survey, preliminary design, detailed design, structural calculations, quantity take-off and permitting. A well-resolved design is half of a good build.

Overhead drone view of a site before design

What we do

We design with the same team that later builds, installs and maintains: what is drawn can be built.

01

Preliminary and detailed design

Floor plans, sections, elevations and perspectives; construction floor plans and construction details.

Structural and foundation calculations, design reports and construction drawings.

02

Building systems in the design

Design and calculation of building systems from the outset, not as an add-on.

Electrical, medium voltage, special systems, plumbing and drainage, and fire protection drawings.

03

Surveying and site

Topographic surveys by drone and total station, and site grading to suit the design.

Cut and fill volumes, graded pads, construction staking and final grades.

04

Permits, specifications and take-off

Municipal permit file and permitting; documentation for tendering or contracting.

Technical specifications, quantity take-off and itemized cost estimate.

References

Projects in this area

Fernando de la Mora

New industrial plant for Encofrados Alsina del Paraguay

Architectural preliminary design and detailed design of the plant: storage area, equipment maintenance and repair areas, loading and unloading yards, showroom and sales area, and offices.

The project included the topographic survey of the site, structural calculations, quantity take-off and cost estimate, design of the electrical and special systems, fire protection drawings, and permitting with the Municipality of Fernando de la Mora.

Also in: Construction · Installations

National University of Asunción

Tender specifications: FADA (UNA)

Technical specifications and quantity take-off for three upgrades to the electrical infrastructure of the School of Architecture, Design and Art: retrofit of the main switchboard with an automatic capacitor bank, replacement of the parking-lot lighting with LED technology, and repair of the vehicle barrier system.

A consolidated document, with unified specifications and execution conditions, prepared as the basis for the school's tender process.

Also in: Engineering and diagnostics · Construction · Installations · Operation and maintenance

Tell us about your project.

A building project, an installation or equipment that won't start: write to us and we will reply with an initial assessment, with no obligation.