Measure before you renovate. We survey complete installations, run tests, perform thermography and deliver a diagnosis of risks and of compliance with the ANDE regulations and IEC standards, with a phased action plan.

Old electrical panels before the survey

What we do

Independent, documented engineering, with the judgment of a team that also builds and maintains.

01

Installation surveys

Panel-by-panel inventory of circuits, protective devices, conductors and grounding.

Updated drawings and data sheets for each panel, with photos and observations.

02

Testing and thermography

Electrical, power quality and grounding measurements, and thermographic detection of hot spots.

Load analysis, harmonics, ground resistance and insulation condition.

03

Energy studies

Transformer and load capacity, demand, and upgrade proposals.

Studies for new loads, such as electric vehicle charging, and for backup sources.

04

Reports and action plans

Prioritized risks, non-conformities and a phased intervention proposal.

Technical reports on each incident: cause, action taken and recommendations.

References

Projects in this area

National University of Asunción

Electrical system survey at FADA (UNA)

Comprehensive survey of the electrical system of the School of Architecture, Design and Art: panel-by-panel inspection, testing and thermography, diagnosis of risks and non-conformities under the ANDE Low Voltage Regulations and IEC 60364 and IEC 61439, and a room-by-room renovation proposal for the administration building.

433
panels inspected
17
tests and thermographic scans
3
technical volumes: diagnosis, supplementary survey and renovation proposal

Also in: Project development · Construction · Installations · Operation and maintenance

Passenger transport

Fleet of 40 electric buses

Study of the energy operations of a transport company: transformer and charging capacity at its depots, fleet energy demand, and an upgrade proposal at medium and low voltage.

Cattle ranch, Altos (Cordillera)

Hydrogeological and grounding study

Well yield report and diagnosis of its overexploitation, which led to the water solution; and a grounding study in clay soil with a high kaolin content, which led to the graphite electrode system.