Grupo Gaia 24/7 Emergencies
Area 2 of 6

Construction

We build private projects only, for businesses and private clients with very high standards, applying the engineering discipline of a critical facility: controlled schedule, cost and quality, and a project lead who answers for the work on site.

Greenhouse complex seen from a drone, with the hill in the background

What we build

From earthworks to handover with final documentation.

01

Civil and industrial works

New construction, extensions and renovations for industry, retail and buildings.

Structures, industrial buildings, machine rooms and equipment shelters, equipment bases and foundations, building envelopes and finishes.

02

Site infrastructure

The works and networks that serve a plant, a complex or a private development.

Earthworks, access roads and paving, water and sewer networks, electrical and data conduits.

03

High-end homes and buildings

Construction and renovation for discerning private clients, with building systems integrated from the design stage.

Electrical, cold and domestic hot water, backup and solar power, quality finishes and final documentation.

04

Construction supervision and management

Owner's engineering for investors: making sure the project is built as contracted.

Supervision, quality control, progress certification and acceptance of the works.

References

Projects in this area

Greenhouse complex

Agralia

Civil works and infrastructure for a production greenhouse complex: site grading, structures and site services, through to greenhouses in production.

Fernando de la Mora

Encofrados Alsina del Paraguay industrial plant

Supervision and management of construction of the new production plant, and complete construction of the office building, with the structures and services required by the various production areas.

Also in: Project development · Installations

Areguá

Kokue Guazú

Earthworks and an industrial building structure for the development of the site.

Also in: Water infrastructure

National University of Asunción

Service entrance to the Art building, FADA (UNA)

Supervision of the service entrance re-electrification works, accepted in December 2024: 130 m of underground conduit, ten reinforced-concrete pull boxes with cast-iron covers, and a masonry enclosure for the main switchboard.

Also in: Installations · Engineering and diagnostics

Tell us about your project.

A building project, an installation or equipment that won't start: write to us and we will reply with an initial assessment, with no obligation.